Torch-On Membrane & Flat Roof Waterproofing
Torch-On Waterproofing Membrane Contractor in Selangor & KL
Torch-on membrane is a bitumen sheet that is heated with a gas torch and bonded to the concrete slab. The seams are lapped and melted together, so the finished roof is one continuous waterproof layer.
It is the workhorse system for reinforced-concrete (RC) flat roofs, rooftop extensions, concrete gutters, planter boxes and podium decks. A mineral-finish membrane is left exposed and resists the Malaysian sun. A sanded finish is laid where tiles or a screed will go on top. Torch-on is the biggest group in the Leak Buster job gallery, with more than 240 photos across both finishes.

Is Your Flat Roof Ready for a New Torch-On Membrane?
- Ponding water that sits on the roof for days after rain
- Old membrane that is cracked, blistered or lifting at the laps
- Leaks spread across a wide area of ceiling, not one crack
- Concrete gutters or planter boxes leaking into the room below
- A previous paint-on coating that has peeled away
How We Lay a Torch-On Membrane on a Flat Roof
- 1
Strip and prepare
Loose old membrane, debris and weak screed are removed and the slab is cleaned and dried.
- 2
Prime the slab
A bitumen primer is rolled on so the membrane bonds to the concrete.
- 3
Torch and lap
Rolls are torched down with overlapping seams, and upstands are turned up the parapet walls and around drains.
- 4
Detail the weak points
Outlets, pipe penetrations and corners get extra reinforcement because that is where roofs usually fail.
- 5
Flood test
The roof is flooded and checked before handover, so any weak lap is found while we are still on site.
Mineral vs Sanded Torch-On Membrane: Which Finish Do You Need?
Mineral finish (exposed)
Granules on the top surface protect the bitumen from UV. Used where the roof stays exposed.
Sanded finish (under screed)
A sand surface that bonds to cement screed or tiles laid on top.
APP vs SBS modified bitumen
APP handles heat well; SBS stays flexible on slabs that move. We choose per roof.
Insulation boards
Optional for rooftops over bedrooms that get too hot.
Torch-On Membrane & Flat Roof Waterproofing Prices in Puchong, KL & Selangor
Three common scopes for this service. The price that applies depends on what the inspection finds.
| Option | Small roof / gutter | Full RC flat roof | Commercial / podium |
|---|---|---|---|
| Typical price | Typical from RM1,500 | Quoted per sq ft | Quoted after inspection |
| Best for | Gutters, planters, small rooftops | Terrace or semi-D rooftop slabs | Shops, offices, podium decks |
| Primer + membrane + upstands | ✓ | ✓ | ✓ |
| Flood test before handover | ✓ | ✓ | ✓ |
| Old membrane removal | If needed | ✓ | ✓ |
| Final price & warranty | In written quotation | In written quotation | In written quotation |
| Exact quotation | Upon request after inspection | Upon request after inspection | Upon request after inspection |
Typical common jobs range from RM450 to RM1,800. The final price and warranty are stated in your written quotation after site inspection, based on the system and job scope (case by case). Exact quotation upon request. Any transport surcharge, if applicable, is confirmed with you during enquiry.
Torch-On Membrane Job Photos from Leak Buster Sites




Related recent jobs
Torch-On Mineral Membrane on a Terrace Rooftop Slab
Exposed mineral-finish torch-on membrane laid over an RC rooftop slab, with upstands at the parapet and detailing at drain outlets.
Sanded Torch-On Membrane Laid Before Screed and Tiles
Sanded-finish torch-on membrane laid on a slab that will be covered with screed or tiles, then flood tested before covering.
Concrete Roof Slab Leak Repaired with Torch-On Membrane
A leaking concrete rooftop around water tanks and equipment, re-waterproofed with torch-on membrane and detailed around plinths.
Torch-On Membrane FAQs
How long does a torch-on membrane last?
As a general guide, a well-laid bituminous membrane can last around 10 years, depending on sun exposure, foot traffic and maintenance. Your warranty period is stated in the quotation.
What is the difference between mineral and sanded torch-on?
Mineral finish is made to stay exposed to the sun. Sanded finish is made to be covered by screed or tiles. Using the wrong one shortens the roof's life.
Can torch-on be laid over the old membrane?
Sometimes, if the old layer is still firmly bonded. Blistered or lifting membrane must be removed first, otherwise the new layer fails with it.
How much does torch-on membrane cost per sq ft?
It depends on the membrane grade, the roof size and how much preparation is needed. Small areas typically start from RM1,500 per job and full roofs are quoted per sq ft after inspection.
Related Waterproofing Services & Areas Covered
No-Hack Bathroom & Toilet Waterproofing
A damp patch on the ceiling under a bathroom is rarely a mystery pipe. Most of the time water is passing through tired tile grout, around the floor…
See how we fix it →
PU Injection Grouting & Leak Sealing
When water drips through a crack in a concrete ceiling, car porch or basement wall, the path runs through the structure itself. Painting over it does…
See how we fix it →
Roof Leak Repair & Roof Tile Coating
A pitched roof can leak from dozens of places: a cracked tile, a ridge with failed mortar, rusted flashing where the roof meets a wall, or a gutter…
See how we fix it →We provide torch-on membrane work across:
Book a Torch-On Membrane Inspection
Send photos and your location on WhatsApp. We confirm the cause on site before quoting.